Energy Consumption and Internal Distribution in Activated Sludge Wastewater Treatment Plants of Greece

Journal

WATER
Volume 12, Issue 4, Pages -

Publisher

MDPI
DOI: 10.3390/w12041204

Keywords

WWTP; energy consumption; energy assessment; aeration tank; activated sludge

Ask authors/readers for more resources

The high-energy consumption of wastewater treatment plants (WWTPs) is a crucial issue for municipalities worldwide. Most WWTPs in Greece operate as extended aeration plants, which results in high operational costs due to high energy needs. The present study investigated the energy requirements of 17 activated sludge WWTPs in Greece, serving between 1100-56,000 inhabitants (population equivalent, PE), with average daily incoming flowrates between 300-27,300 m(3)/d. The daily wastewater production per inhabitant was found to lie between 0.052 m(3)/PE.d and 0.426 m(3)/PE.d, with average volume of 0.217 +/- 0.114 m(3)/PE.d. The electric energy consumption per volume unit (E-Q (kWh/m(3))) was between 0.128-2.280 kWh/m(3) (average 0.903 +/- 0.509 kWh/m(3)) following a near logarithmic descending correlation with the average incoming flowrate (Q(av)) (E-Q = 0.294/nQ(av) + 3.1891; R-2 = 0.5337). A similar relationship was found between the daily electric energy requirements for wastewater treatment per inhabitant (E-PE (kWh/PE.d)) as a function of PE, which varied from 0.041-0.407 kWh/PE.d (average 0.167 +/- 0.101 kWh/PE.d)) (E-PE = 0.073ln(PE) + 0.8425; R-2 = 0.6989). Similarly, the daily energy cost per inhabitant (E-(sic)/PE ((sic)/PE.d)) as a function of PE and the electric energy cost per wastewater volume unit (E-(sic)/V ((sic)/m(3))) as a function of average daily flow (Q(av)) were found to follow near logarithmic trends (E-(sic)/PE = 0.013ln(PE) + 0.1473; R-2 = 0.6388, and E-(sic)/V = 0.052lnQ(av) + 0.5151; R-2 = 0.6359), respectively), with E-(sic)/PE varying between 0.005-0.073 (sic)/PE.d (average 0.024 +/- 0.019 (sic)/PE.d) and E-(sic)/V between 0.012-0.291 (sic)/m(3) (average 0.111 +/- 0.077 (sic)/m(3)). Finally, it was calculated that, in an average WWTP, the aeration process is the main energy sink, consuming about 67.2% of the total electric energy supply to the plant. The large variation of energy requirements per inlet volume unit and per inhabitant served, indicate that there is large ground for improving the performance of the WWTPs, with respect to energy consumption.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available