4.7 Article

A regional integrated energy system with a coal-fired CHP plant, screw turbine and solar thermal utilization: Scenarios for China

Journal

ENERGY CONVERSION AND MANAGEMENT
Volume 212, Issue -, Pages -

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.enconman.2020.112812

Keywords

Regional integrated energy system; CHP; Steam supply pipeline; Screw turbine; Solar thermal utilization; Energy, exergy and entransy

Funding

  1. Natural Science Foundation of Beijing [3172031]

Ask authors/readers for more resources

Regional integrated energy system has been a suitable scheme in China to satisfy eco-industrial park's both electric and heat needs. Combined heat and power (CHP) is an efficient technology for coal-fired plants during heating seasons. Currently, wires transport electric from CHP to destination while urban pipes network transport heat from CHP to destination, respectively. However, this might not be the case in future, when eco-industrial parks are close to plants or pipes network can't carry enough heat. This paper presents a feasible regional integrated energy system which meets both electric and heat's needs with steam from CHP while maintaining photothermal resources' high percent utilization. This system includes a coal-fired CHP plant, pressure matcher, steam supply pipeline, screw turbine and solar thermal utilization part. This paper set up a model of 600 MW electric power CHP with pressure matcher and screw turbine in Ebsilon software. Then the steam supply pipeline and solar thermal utilization part were developed and analyzed based on the basic thermodynamic theories with Beijing and Huzhou's meteorological statistics taken into consideration. Besides, the operational issues of the regional system were also listed. Meanwhile, the regional integrated energy system was obtained and a lot of characteristics were analyzed. Main devices were further investigated with energy, exergy and entransy analysis. Three extreme working situations were also carried out and discussed in the end. Several useful conclusions were drawn. It's necessary for China to masterly integrate regional energy system with multi-energy. Moreover, pressure matcher is high-efficient in general under other parameters' influences. This extracting steam's technology might be considered in future. Besides, low-stent placed pipeline which can transport high-parameter steam 4 km at most was introduced. A proper mass flow value or lower inlet temperature will both reduce loss of pipeline. Furthermore, heat user side can offer electric power about 9.22 MW, heating acreage about 0.79 km(2) to the eco-industrial park. More solar heat's import, lower upper temperature difference and less sunlight will favor solar thermal utilization part. Higher heat load or lower CHP's working condition will benefit screw turbine. Peak heat exchanger doesn't need to work when supply domestic water temperature's demand is less than 65 degrees C. The simulation in this paper might give technological statistics to the regional integrated energy system which has CHP and photothermal. This will help to put this energy system into actual use in future.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available