Related references
Note: Only part of the references are listed.Heuristics for the mixed no-idle flowshop with sequence-dependent setup times
Fernando Luis Rossi et al.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2021)
A Pareto approach for the multi-factory supply chain scheduling and distribution problem
Ali Gharaei et al.
OPERATIONAL RESEARCH (2021)
An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company
S. Mohammadi et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2020)
A coordinated production and transportation scheduling problem with minimum sum of order delivery times
Ling Liu et al.
JOURNAL OF HEURISTICS (2020)
Time/sequence-dependent scheduling: the design and evaluation of a general purpose tabu-based adaptive large neighbourhood search algorithm
Lei He et al.
JOURNAL OF INTELLIGENT MANUFACTURING (2020)
Solving a large multi-product production-routing problem with delivery time windows
Fabio Neves-Moreira et al.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2019)
A Biased-Randomized Iterated Local Search Algorithm for Rich Portfolio Optimization
Renatas Kizys et al.
APPLIED SCIENCES-BASEL (2019)
A coordinated algorithm for integrated production scheduling and vehicle routing problem
Xuxia Zou et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2018)
An improved adaptive large neighborhood search algorithm for multiple agile satellites scheduling
Lei He et al.
COMPUTERS & OPERATIONS RESEARCH (2018)
Supply chain optimisation with both production and transportation integration: multiple vehicles for a single perishable product
Philippe Lacomme et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2018)
Iterated local and very-large-scale neighborhood search for a novel uncapacitated exam scheduling model
Salim Haddadi et al.
INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT (2018)
A capacitated vehicle routing problem with order available time in e-commerce industry
Ling Liu et al.
ENGINEERING OPTIMIZATION (2017)
Mathematical model and exact algorithm for the home care worker scheduling and routing problem with lunch break requirements
Ran Liu et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2017)
Integrated production and distribution scheduling with a perishable product
Priyantha Devapriya et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2017)
A Benders decomposition-based heuristic for a production and outbound distribution scheduling problem with strict delivery constraints
Y. Kergosien et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2017)
An adaptive large neighborhood search for the full truckload pickup and delivery problem with resource synchronization
Axel Grimault et al.
COMPUTERS & OPERATIONS RESEARCH (2017)
GLNS: An effective large neighborhood search heuristic for the Generalized Traveling Salesman Problem
Stephen L. Smith et al.
COMPUTERS & OPERATIONS RESEARCH (2017)
A large neighborhood search heuristic for supply chain network design
Majid Eskandarpour et al.
COMPUTERS & OPERATIONS RESEARCH (2017)
Multi-objective adaptive large neighborhood search for distributed reentrant permutation flow shop scheduling
Achmad P. Rifai et al.
APPLIED SOFT COMPUTING (2016)
Sequential and parallel large neighborhood search algorithms for the periodic location routing problem
Vera C. Hemmelmayr
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2015)
An adaptive large neighbourhood search for the operational integrated production and distribution problem of perishable products
M. A. F. Belo-Filho et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2015)
Balancing Production and Distribution in Paper Manufacturing
H. Neil Geismar et al.
PRODUCTION AND OPERATIONS MANAGEMENT (2015)
Rich Vehicle Routing Problem: Survey
Jose Caceres-Cruz et al.
ACM COMPUTING SURVEYS (2015)
Integrated production and distribution scheduling with lifespan constraints
Christian Viergutz et al.
ANNALS OF OPERATIONS RESEARCH (2014)
The nuclear medicine production and delivery problem
Jongsung Lee et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2014)
Hybrid simulation and MIP based heuristic algorithm for the production and distribution planning in the soft drink industry
Cagri Sel et al.
JOURNAL OF MANUFACTURING SYSTEMS (2014)
Managing perishability in production-distribution planning: a discussion and review
P. Amorim et al.
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL (2013)
A constraint programming approach to designing a newspaper distribution system
Robert Russell
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2013)
A new approach to tactical and strategic planning in production-distribution networks
Mahdi Bashiri et al.
APPLIED MATHEMATICAL MODELLING (2012)
An adaptive large neighborhood search heuristic for the cumulative capacitated vehicle routing problem
Glaydston Mattos Ribeiro et al.
COMPUTERS & OPERATIONS RESEARCH (2012)
Integrated production and distribution planning for perishable food products
Poorya Farahani et al.
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL (2012)
Multi-objective integrated production and distribution planning of perishable products
P. Amorim et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2012)
Simultaneous production and logistics operations planning in semicontinuous food industries
Georgios M. Kopanos et al.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2012)
Efficient GRASP plus VND and GRASP plus VNS metaheuristics for the traveling repairman problem
Amir Salehipour et al.
4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH (2011)
An integrated production-distribution model for a deteriorating inventory item
Changyuan Yan et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2011)
Hybridization of very large neighborhood search for ready-mixed concrete delivery problems
Verena Schmid et al.
COMPUTERS & OPERATIONS RESEARCH (2010)
Integrated production and delivery scheduling with disjoint windows
Yumei Huo et al.
DISCRETE APPLIED MATHEMATICS (2010)
Integrated Production and Outbound Distribution Scheduling: Review and Extensions
Zhi-Long Chen
OPERATIONS RESEARCH (2010)
Pool-Point Distribution of Zero-Inventory Products
H. Neil Geismar et al.
PRODUCTION AND OPERATIONS MANAGEMENT (2010)
Production scheduling and vehicle routing with time windows for perishable food products
Huey-Kuo Chen et al.
COMPUTERS & OPERATIONS RESEARCH (2009)
Analysis, modeling and solution of the concrete delivery problem
Lasse Asbach et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2009)
A simulation/metaheuristic approach to newspaper production and distribution supply chain problems
Wen-Chyuan Chiang et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2009)
A Hybrid Solution Approach for Ready-Mixed Concrete Delivery
Verena Schmid et al.
TRANSPORTATION SCIENCE (2009)
Integrating multi-product production and distribution in newspaper logistics
Robert Russell et al.
COMPUTERS & OPERATIONS RESEARCH (2008)
Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
Kunpeng Li et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
A zero-inventory production and distribution problem with a fixed customer sequence
Ronald Armstrong et al.
ANNALS OF OPERATIONS RESEARCH (2008)
The integrated production and transportation scheduling problem for a product with a short lifespan
H. Neil Geismar et al.
INFORMS JOURNAL ON COMPUTING (2008)
A unified heuristic for a large class of Vehicle Routing Problems with Backhauls
S Ropke et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2006)
Order assignment and scheduling in a supply chain
ZL Chen et al.
OPERATIONS RESEARCH (2006)
Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost
G Pundoor et al.
NAVAL RESEARCH LOGISTICS (2005)
Production and delivery scheduling problem with time windows
JM Garcia et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2005)
Integrated scheduling of production and distribution operations
ZL Chen et al.
MANAGEMENT SCIENCE (2005)
Coordinated scheduling of production and delivery from multiple plants
JM Garcia et al.
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING (2004)
Heuristic scheduling of parallel machines with sequence-dependent set-up times
ME Kurz et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2001)