4.7 Article

Improved project control for sustainable development of construction sector to reduce environment risks

Journal

JOURNAL OF CLEANER PRODUCTION
Volume 240, Issue -, Pages -

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.jclepro.2019.118214

Keywords

Cleaner project control; Construction sector; Environmental risk; Sustainable development; Formal and informal control; Project control performance

Funding

  1. Economics, Management and Chemical Engineering Departments of COMSATS University Islamabad, Lahore Campus, Malaysia Marine Department
  2. EU [CZ.02.1.01/0.0/0.0/15_ 003/0000456]
  3. Czech Republic Operational Programme Research and Development, Education, Priority 1: Strengthening capacity for quality research

Ask authors/readers for more resources

This study examines how environmental concerns impact the connectivity amid formal, informal control and performance based on data gathered from different 156 construction companies. The empirical outcomes illustrate that behaviour, outcome relationship between variables and clan control affirmatively affect performance on construction projects. However, self-control is unimportantly identified with project execution. This research uncovers that in construction projects, the adequacy of managerial control varies. The results further suggest that interior environmental concerns contrarily moderate the consequence of control of cleaner merchandise enactment during projects. However, external natural hazards emphatically direct the adequacy of project control, showing noteworthy and assorted roles played by different ecological dangers in the assembly of control and project execution. The interactive empirical outcomes between formal control and external environmental hazards are significantly related to project performance(t > 2, and p < 0.05) however the controlling impact of the inner environmental hazard on project control is relatively lower (beta = 0.338, p > 0.05). The study concluded the least significant of all controller means towards the enactment of construction projects. Results showed that for complex projects, operative control approaches should be prioritised over ineffective control methods. (C) 2019 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available