Journal
PHYSICAL REVIEW ACCELERATORS AND BEAMS
Volume 22, Issue 10, Pages -Publisher
AMER PHYSICAL SOC
DOI: 10.1103/PhysRevAccelBeams.22.100702
Keywords
-
Categories
Funding
- Office of Science of the US Department of Energy [DEAC02-05CH11231]
Ask authors/readers for more resources
We present a new accelerator toolbox (AT)-based toolkit for simulating the commissioning of light-source storage rings. The toolkit provides a framework for supporting high-level scripts to represent with realism the various procedures (e.g., orbit and optics correction, beam-based alignment, etc.) encountered during commissioning and is designed to mirror as closely as possible the reality as seen from the control room. Emphasis is placed on the inclusion of a comprehensive set of error sources and faithful modeling of beam diagnostics. The toolkit capabilities arc demonstrated in an application to the recent design and commissioning studies of the Advanced Light Source Upgrade (ALS-U) Accumulator Ring, a short-time successful commissioning of which will be critical to the overall ALS-U project success.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available