4.8 Article

Startup and long term operation of enhanced biological phosphorus removal in continuous-flow reactor with granules

Journal

BIORESOURCE TECHNOLOGY
Volume 212, Issue -, Pages 92-99

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.biortech.2016.04.008

Keywords

Enhanced biological phosphorus removal; Continuous-flow reactor; Granules; Startup; Long term operation

Funding

  1. Trans-Century Training Programme Foundation for the Talents by the State Education Commission [NCET-10-0008]
  2. water project of National Science and Technology Major Project [2012ZX07202-005]

Ask authors/readers for more resources

The startup and long term operation of enhanced biological phosphorus removal (EBPR) in a continuous-flow reactor (CFR) with granules were investigated in this study. Through reducing the settling time from 9 min to 3 min gradually, the startup of EBPR in a CFR with granules was successfully realized in 16 days. Under continuous-flow operation, the granules with good phosphorus and COD removal performance were stably operated for more than 6 months. And the granules were characterized with particle size of around 960 mu m, loose structure and good settling ability. During the startup phase, polysaccharides (PS) was secreted excessively by microorganisms to resist the influence from the variation of operational mode. Results of relative quantitative PCR indicated that granules dominated by polyphosphateaccumulating organisms (PAOs) were easier accumulated in the CFR because more excellent settling ability was needed in the system. (C) 2016 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available