Related references
Note: Only part of the references are listed.Grade and Tonnage Uncertainty Analysis of an African Copper Deposit Using Multiple-Point Geostatistics and Sequential Gaussian Simulation
Amol Paithankar et al.
NATURAL RESOURCES RESEARCH (2018)
Combined optimisation of an open-pit mine outline and the transition depth to underground mining
D. Whittle et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2018)
Optimizing the open pit-to-underground mining transition
Barry King et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2017)
A stochastic optimization formulation for the transition from open pit to underground mining
James A. L. MacNeil et al.
OPTIMIZATION AND ENGINEERING (2017)
A stochastic mathematical model for determination of transition time in the non-simultaneous case of surface and underground mining
E. Bakhtavar et al.
JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY (2017)
Mining above and below ground: timing the transition
Alexandra M. Newman et al.
IIE TRANSACTIONS (2013)
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
Mohammad Waqar Ali Asad et al.
RESOURCES POLICY (2013)
Transition from open-pit to underground as a new optimization challenge in mining engineering
E. Bakhtavar et al.
JOURNAL OF MINING SCIENCE (2009)
An application of Branch and Cut to open pit mine scheduling
L Caccetta et al.
JOURNAL OF GLOBAL OPTIMIZATION (2003)
Optimization principle of combined surface and underground mining and its applications
JH Chen et al.
JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY (2003)