Journal
IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY
Volume 29, Issue 5, Pages -Publisher
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TASC.2019.2901246
Keywords
High-temperature superconductors; nuclear magnetic resonance; superconducting magnets
Funding
- National Institute of General Medical Sciences of the National Institutes of Health [R01GM114834]
Ask authors/readers for more resources
We present assembly and test results of a 3-nested-coil 800-MHz (18.8 T) REBCO insert (H800) for the MIT 1.3 GHz LTS/HTS NMR magnet currently under completion. Each of the three H800 coils is a stack of no-insulation (NI) REBCO double-pancake coils (DPs). The innermost 8.7-T Coil 1 (26 DPs) was completed by mid-2016; the middle 5.6-T Coil 2 (32 DPs) was completed in mid-2017; while the outermost 4.5-T Coil 3 (38 DPs) was completed in early 2018. Coils 1, 2, and 3 were assembled together in early 2018 as a 3-nested-coil, the H800, and tested, first in liquid nitrogen to a power supply current of 20 A, followed by testing in liquid helium to a power supply current of 251.3 A, the H800's design operating current. After roughly five minutes settling time at 251.3 A, the H800 quenched. In this paper, we examine probable sources of quench initiation and simulate ensuing quench behavior. Remedial efforts to minimize the tendency toward quenching in the H800 are presented and discussed.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available