4.7 Article

Distribution System Expansion Planning Considering Non-Utility-Owned DG and an Independent Distribution System Operator

Journal

IEEE TRANSACTIONS ON POWER SYSTEMS
Volume 34, Issue 4, Pages 2588-2597

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2019.2897869

Keywords

Distribution system expansion planning; independent distribution system operator (IDSO); non-utility-owned distributed generation; transactive energy; trilevel programming

Funding

  1. Ministry of Economy and Competitiveness of Spain [ENE2015-63879-R]

Ask authors/readers for more resources

This paper addresses the multistage or dynamic investment decision-making problem arising in a distribution system within a transactive energy environment. Under such a framework, three agents are involved, namely the distribution company (DISCO), the owner of distributed generation (DG) units (DGENCO), and the independent distribution system operator (IDSO). Here, we propose characterizing this planning problem as an instance of trilevel programming. In the upper level, the DISCO identifies the optimal investment plan in network assets and the best potential locations for DG in order to supply the customer demand at maximum profit. In the middle level, the DGENCO determines the best location, sizing, and timing for DG installation so that the corresponding profit is maximized. Finally, in the lower level, the IDSO is responsible for the optimal operation of the expanded distribution system. The resulting mixed-integer trilevel program is solved by a novel approach relying on Benders decomposition. The performance of the proposed approach has been illustrated with a case study based on a 37-node test system.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available