4.3 Article

Optimal Charge Scheme Calculation for Multiring Blasting Using Modified Harries Mathematical Model

Journal

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CF.1943-5509.0001263

Keywords

Multiring blasting; Fragment-size prediction; Harries mathematical model; Charge scheme optimization

Funding

  1. National Natural Science Foundation Project of China [41807259]
  2. State Key Laboratory of Safety and Health for Metal Mines [2017-JSKSSYS-04]
  3. Shenghua Lieying Program of Central South University
  4. China Postdoctoral Science Foundation [2017M622610]
  5. Natural Science Foundation of Hunan Province [2018JJ3693]

Ask authors/readers for more resources

A new optimization method for optimal charge scheme calculation is proposed to reduce undesired phenomenon in ring blasting, including brow damage, overcrushing, and bulking yield, which are caused by the unreasonable distribution of blasting energy. First, all the feasible charge schemes are calculated by a traversal algorithm. Then fragment size value is predicted according to the blasting simulation program, which is based on a modified Harries mathematical model. Finally, the optimal charge scheme is selected by the X-50 and X-90 - X-10 of fragment size value of the muck pile. The program is developed by Visual LISP on the AutoCAD platform. A case study illustrates the optimization procedure, and some field tests were conducted in Tonglvshan copper mine and Fankou mine to verify the feasibility of the program. The optimization method can play a positive role in brow protection. It can also obviously improve the muck pile fragment-size distribution. (C) 2019 American Society of Civil Engineers.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.3
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available