4.5 Article

Performance evaluation of a utility-scale grid-tied solar photovoltaic (PV) installation in Ghana

Journal

ENERGY FOR SUSTAINABLE DEVELOPMENT
Volume 48, Issue -, Pages 82-87

Publisher

ELSEVIER SCIENCE BV
DOI: 10.1016/j.esd.2018.11.003

Keywords

PV system; Capacity factor; Final energy yield; Performance ratio; Utility; Ghana

Funding

  1. Norwegian Agency for Development Cooperation (Norad)
  2. NMBU through the Energy and Petroleum Programme (EnPe) Initiative

Ask authors/readers for more resources

This study presents the outdoor performance assessment of a 2.5 MW solar-photovoltaic power plant installed at Navrongo, in the northern part of Ghana. The system's hourly energy output and environmental data between June 2013 and May 2016 were collected and analysed. The average yearly energy generated by the installation was 3547.8 MWh, while the performance ratio was found to be 70.4% and levelized cost of energy estimated as US$0.2411/kWh. Using the prevailing exchange rate at the time of commissioning and guaranteed feed-in tariff, the installation's discounted payback period is estimated at 14.95 years. Furthermore, the solar PV power plant project has saved over 3852 metric tons of carbon per year since its installation. (C) 2018 International Energy Initiative. Published by Elsevier Inc. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available