A group TOPSIS-COPRAS methodology with Pythagorean fuzzy sets considering weights of experts for project critical path problem

Journal

JOURNAL OF INTELLIGENT & FUZZY SYSTEMS
Volume 36, Issue 2, Pages 1375-1387

Publisher

IOS PRESS
DOI: 10.3233/JIFS-172252

Keywords

Project critical path; marble processing plant; Pythagorean fuzzy sets (PFSs); group decision-making methodology; decision makers' weights; TOPSIS; COPRAS

Ask authors/readers for more resources

Uncertainty plays an important role in project decision-making problems that involve incomplete and imperfect information of real-world situations. To completely considering the uncertainty of decision-making methods, Pythagorean fuzzy sets (PFSs) are used. PFSs in comparisons with classic fuzzy sets provide degrees of membership, non-membership and hesitancy, and in comparisons with intuitionistic fuzzy sets (IFSs), they prepare the larger space to explain the agreement, disagreement and hesitancy grades. In this paper, to tackle the uncertainty of real-world projects and determine the critical path of projects by considering efficient criteria, such as time, cost, risk, quality and safety, a new group decision methodology is extended based on concepts of technique for order of preference by similarity to ideal solution (TOPSIS) and complex proportional assessment (COPRAS) methods under PFSs. Furthermore, a new modified version of the proposed methodology is used to specify the weight of each expert. Finally, a case study from the literature, concerning workflow schema of marble processing plants project, is presented to better express the capability of the proposed methodology.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.4
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available