4.7 Article

Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups

Journal

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 57, Issue 22, Pages 6893-6907

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2019.1571251

Keywords

Batch scheduling; lot streaming; sequence-dependent setups; incompatible product family; hybrid flow shop

Ask authors/readers for more resources

A paint manufacturing firm's customers typically place orders for two or more products simultaneously. Each product belongs to a family that denotes batching compatibility during manufacturing. Further, products can be split into several sublots to allow overlapping production in a two-stage hybrid flow shop wherein various identical, capacitated machines operate in parallel at each stage. We present a mixed-integer linear program (MILP) for this integrated batching and lot streaming problem with variable sublots, incompatible job families, and sequence-dependent setup times. The model determines the number and size of sublots for each product and the production sequencing for each sublot such that the total weighted completion time is minimised. To promote practical implementation, we develop and evaluate heuristics to efficiently solve this problem.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available