4.4 Article

Developing new participation model of thermal generating units in flexible ramping market

Journal

IET GENERATION TRANSMISSION & DISTRIBUTION
Volume 13, Issue 11, Pages 2290-2298

Publisher

INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/iet-gtd.2018.6244

Keywords

power generation economics; power generation dispatch; power markets; thermal power stations; participation model; thermal generating units; flexible ramping market; supply sector; renewable-penetrated power systems; secure operation; supply curtailments; real-time market; proper opportunity; FRP requirements; IEEE-118 bus test system; electricity market; load curtailments; flexible ramping product; ramp rates

Ask authors/readers for more resources

Uncertainty and variability in the supply sector of renewable-penetrated power systems is becoming a new challenge for secure operation of these systems which if not responded properly may cause large amounts of load and supply curtailments. To meet this challenge, some ISOs recently have employed a new product named Flexible Ramping Product (FRP) into their markets which enhances the capability of the system to overcome such uncertainties by reserving additional ramp rates. In this regard, a new framework for implementing FRP in real-time market is proposed here. The proposed framework provides a proper opportunity for participation of thermal generating units in procuring FRP requirements. The developed model is implemented on the IEEE-118 bus test system and simulation results demonstrate significant effectiveness of this mechanism in reducing load and supply curtailments and run the electricity market more efficiently.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.4
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available