Related references
Note: Only part of the references are listed.Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types
Dai Q. Tran et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2018)
Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types
Dai Q. Tran et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2018)
Performance of Design-Build and Design-Bid-Build Projects for Public Universities
Pramen P. Shrestha et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2017)
Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality
Jera Sullivan et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2017)
Impact of Alternative Project Delivery Systems on the International Roughness Index Case Studies of Transportation Projects in the Western United States
Hoseb Abkarian et al.
TRANSPORTATION RESEARCH RECORD (2017)
Performance of Design-Build and Design-Bid-Build Projects for Public Universities
Pramen P. Shrestha et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2017)
Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality
Jera Sullivan et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2017)
Selecting Project Delivery Systems Based on Simplified Neutrosophic Linguistic Preference Relations
Sui-Zhi Luo et al.
SYMMETRY-BASEL (2017)
Design-Bid-Build (DBB) vs. Design-Build (DB) in the US public transportation projects: The choice and consequences
Jane Park et al.
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2017)
Project Delivery Method Performance for Public School Construction: Design-Bid-Build versus CM at Risk
Noel Carpenter et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2016)
Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects
RunZhi Jin et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2016)
Key Factors of Project Characteristics Affecting Project Delivery System Decision Making in the Chinese Construction Industry: Case Study Using Chinese Data Based on Rough Set Theory
Bingsheng Liu et al.
JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE (2016)
Project Delivery Method Performance for Public School Construction: Design-Bid-Build versus CM at Risk
Noel Carpenter et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2016)
Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects
RunZhi Jin et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2016)
An integrated fuzzy multi-criteria group decision making approach for project delivery system selection
M. Khanzadi et al.
SCIENTIA IRANICA (2016)
Comparing Project Performance of Design-Build and Design-Bid-Build Methods for Large-sized Public Apartment Housing Projects in Korea
Hye-Sung Park et al.
JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING (2015)
Investigation of the case-based reasoning retrieval process to estimate resources in construction projects
Borja Garcia De Soto et al.
CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS (2015)
Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors
Xiang Ding et al.
MATHEMATICAL PROBLEMS IN ENGINEERING (2014)
A framework of combining case-based reasoning with a work breakdown structure for estimating the cost of online course production projects
Wu He
BRITISH JOURNAL OF EDUCATIONAL TECHNOLOGY (2014)
Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida
R. Edward Minchin et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2013)
Municipal Water/Wastewater Project Delivery Performance Comparison
Jennifer S. Shane et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2013)
Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects
Pramen P. Shrestha et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2012)
Project delivery system selection of construction projects in China
Yong Qiang Chen et al.
EXPERT SYSTEMS WITH APPLICATIONS (2011)
Selection of Project Delivery Method in Transit: Drivers and Objectives
Ali Touran et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2011)
Case-Based Reasoning for Construction Hazard Identification: Case Representation and Retrieval
Y. M. Goh et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2009)
Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods
Darren R. Hale et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2009)
Developing a Performance Index for Relationship-Based Construction Projects in Australia: Delphi Study
John F. Y. Yeung et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2009)
Comparative analysis of project delivery systems cost performance in pacific northwest public schools
Eddy M. Rojas et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2008)
A case-based decision support tool for bid mark-up estimation of international construction projects
Irem Dikmen et al.
AUTOMATION IN CONSTRUCTION (2007)
Project delivery system selection under uncertainty: Multicriteria multilevel decision aid model
Fereshteh Mafakheri et al.
JOURNAL OF MANAGEMENT IN ENGINEERING (2007)
A strategy for evaluating a fuzzy case-based construction procurement selection system
DT Luu et al.
ADVANCES IN ENGINEERING SOFTWARE (2006)
PPMS: a Web-based construction project performance monitoring system
SO Cheung et al.
AUTOMATION IN CONSTRUCTION (2004)
Using neural network to predict performance of design-build projects in Singapore
FYY Ling et al.
BUILDING AND ENVIRONMENT (2004)
Procurement methods for US infrastructure: historical perspectives and recent trends
R Pietroforte et al.
BUILDING RESEARCH AND INFORMATION (2002)
Influence of project type and costs in building procurement method on rework construction projects
PED Love
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2002)
Project procurement system selection model
T Alhazmi et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2000)