4.5 Article

Designing a performance measurement system to support materials management in engineer-to-order: a case study

Related references

Note: Only part of the references are listed.
Article Engineering, Manufacturing

Implications of automation in engineer-to-order production: a case study

Borge Sjobakk et al.

ADVANCES IN MANUFACTURING (2014)

Article Management

Improving operational performance by influencing shopfloor behavior via performance management practices

Sander de Leeuw et al.

JOURNAL OF OPERATIONS MANAGEMENT (2011)

Article Management

An integrated model for performance management of manufacturing units

P. Parthiban et al.

BENCHMARKING-AN INTERNATIONAL JOURNAL (2011)

Article Management

Aligning products with supply chain processes and strategy

Euthemia Stavrulaki et al.

INTERNATIONAL JOURNAL OF LOGISTICS MANAGEMENT (2010)

Review Engineering, Industrial

Engineer-to-order supply chain management: A literature review and research agenda

Jonathan Gosling et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2009)

Article Business

Developing key performance indicators for supply chain: an industry perspective

Bongsug (Kevin) Chae

SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL (2009)

Article Construction & Building Technology

An ontology-based approach to support decision-making for the design of ETO (Engineer-To-Order) products

Aarti Pandit et al.

AUTOMATION IN CONSTRUCTION (2007)

Article Construction & Building Technology

Research in automated measurement of project performance indicators

R. Navon

AUTOMATION IN CONSTRUCTION (2007)

Review Engineering, Industrial

Performance measures and metrics in logistics and supply chain management: a review of recent literature (1995-2004) for research and applications

Angappa Gunasekaran et al.

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2007)

Article Business

Flexibility and rigidity in custornization and build-to-order production

P Fredriksson et al.

INDUSTRIAL MARKETING MANAGEMENT (2005)

Article Construction & Building Technology

Effects of delivery systems on change order size and frequency in mechanical construction

DR Riley et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2005)

Article Management

Responding to schedule changes in build-to-order supply chains

L Krajewski et al.

JOURNAL OF OPERATIONS MANAGEMENT (2005)

Review Management

Build-to-order supply chain management: a literature review and framework for development

A Gunasekaran et al.

JOURNAL OF OPERATIONS MANAGEMENT (2005)

Article Management

Integrating production and engineering perspectives on the customer order decoupling point

J Wikner et al.

INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT (2005)

Article Management

Improving inter-functional coordination to face high product variety and frequent modifications

P Danese et al.

INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT (2004)

Article Engineering, Industrial

Strategic positioning of the order penetration point

J Olhager

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2003)

Article Public Administration

Why measure performance? Different purposes require different measures

RD Behn

PUBLIC ADMINISTRATION REVIEW (2003)

Article Management

Performance measures and metrics in a supply chain environment

A Gunasekaran et al.

INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT (2001)

Article Computer Science, Interdisciplinary Applications

Integrated planning and scheduling in the engineer-to-order sector

D Little et al.

INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING (2000)

Article Engineering, Industrial

Supply chain management: A strategic issue in engineer to order manufacturing

C Hicks et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2000)

Article Management

Designing, implementing and updating performance measurement systems

M Bourne et al.

INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT (2000)