4.6 Article

Treatment of Olive Mill Wastewater with Constructed Wetlands

Journal

WATER
Volume 4, Issue 1, Pages 260-271

Publisher

MDPI AG
DOI: 10.3390/w4010260

Keywords

effluent recirculation; free water surface constructed wetlands; nutrient removal; olive mill wastewater; organic load removal; phenols

Funding

  1. EU [INCO 517612 (MELIA)]

Ask authors/readers for more resources

The objective of this study was to investigate the application of constructed wetlands as a mean to manage olive mill wastewater (OMW). Two free water surface (FWS) constructed wetlands, one without (CW1) and one with effluent recirculation (CW2), were operated for a two-year period with diluted OMW (1: 10) and evaluated in terms of the removal of COD, TSS, TKN, NH4+-N, NO3--N, TP and total phenols. The organic loading rate of CWs was adjusted to 925 kg BOD/ha.d. In CW1 the removal efficiency averaged 80%, 83%, 78%, 80%, and 74% for COD, TSS, TKN, TP, and total phenols, respectively, during the operation period. Effluent recirculation further improved the treatment efficiency which approached 90%, 98%, 87%, 85%, and 87% for COD, TSS, TKN, TP, and total phenols, respectively. Constructed wetlands also showed high removal efficiency for NH4+-N. Nitrate concentration maintained low in both CWs basins, probably due to the prevalence of high denitrification rates that efficiently removed the NO3--N produced by NH4+-N oxidation. Despite the increased removal percentages, pollutant concentration in effluent exceeded the allowable limits for discharge in water bodies, suggesting that additional practices, including enhanced pre-application treatment and/or higher dilution rates, are required to make this practice effective for OMW management.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available