4.2 Article

Urban Viaduct in Povazska Bystrica, Slovakia

Journal

STRUCTURAL ENGINEERING INTERNATIONAL
Volume 21, Issue 3, Pages 356-359

Publisher

IABSE
DOI: 10.2749/101686611X12910257102910

Keywords

multi-span; extradosed bridge; box girder; overhangs; cantilever construction; stay cables; internal ties

Funding

  1. Ministry of Education, Youth and Sports of the Czech Republic [1M0579]

Ask authors/readers for more resources

A multi-span extradosed bridge that was built on the D1 motorway in Povazska Bystrica, Slovakia, is described in terms of architectural and structural solution and construction technology. The concrete deck is suspended on seven low pylons situated in the bridge axis. The deck is formed of a single box girder with large overhangs supported by precast V-shaped struts. The bridge was simultaneously cast in 2 x 7 symmetrical cantilevers originating from H-shaped piers. The bridge having a total length of 958 m was built within 22 months.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.2
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available