4.7 Article

Forecasting large aftershocks within one day after the main shock

Journal

SCIENTIFIC REPORTS
Volume 3, Issue -, Pages -

Publisher

NATURE PORTFOLIO
DOI: 10.1038/srep02218

Keywords

-

Funding

  1. Aihara Innovative Mathematical Modelling Project
  2. Japan Society for the Promotion of Science (JSPS)
  3. Council for Science and Technology Policy (CSTP)
  4. JSPS
  5. JSPS KAKENHI [23240039]
  6. Grants-in-Aid for Scientific Research [23240039] Funding Source: KAKEN

Ask authors/readers for more resources

Forecasting the aftershock probability has been performed by the authorities to mitigate hazards in the disaster area after a main shock. However, despite the fact that most of large aftershocks occur within a day from the main shock, the operational forecasting has been very difficult during this time-period due to incomplete recording of early aftershocks. Here we propose a real-time method for efficiently forecasting the occurrence rates of potential aftershocks using systematically incomplete observations that are available in a few hours after the main shocks. We demonstrate the method's utility by retrospective early forecasting of the aftershock activity of the 2011 Tohoku-Oki Earthquake of M9.0 in Japan. Furthermore, we compare the results by the real-time data with the compiled preliminary data to examine robustness of the present method for the aftershocks of a recent inland earthquake in Japan.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available