4.3 Article

Building models for model predictive control of office buildings with concrete core activation

Journal

JOURNAL OF BUILDING PERFORMANCE SIMULATION
Volume 6, Issue 3, Pages 175-198

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/19401493.2012.680497

Keywords

concrete core activation (CCA); model predictive control (MPC); controller building model; parameter estimation; office building

Funding

  1. Institute for the Promotion of Innovation through Science and Technology in Flanders (IWT-Vlaanderen)
  2. European ERANET-EraSME-GEOTABS project

Ask authors/readers for more resources

Model predictive control (MPC) is a good candidate to exploit the energy cost savings potential of concrete core activation (CCA), while guaranteeing thermal comfort. A bottleneck for practical implementation is the selection and identification of the building control model. Using grey box models, this article studies the impact of model structure and identification data set on the MPC control performance for an office building with CCA. Results for a one-year simulation show: (1) a second-order model can achieve equal control performance as a fourth-order one, (2) inclusion of solar or internal gains in the identification data set improves the model accuracy in general, especially for the fourth-order models and (3) MPC with a second-order model reduces electricity consumption by 15% compared to a reference controller, hereby deploying information about past operative temperature prediction errors and this without the need for solar or internal gains predictions.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.3
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available