Journal
AUTOMATION IN CONSTRUCTION
Volume 53, Issue -, Pages 13-21Publisher
ELSEVIER SCIENCE BV
DOI: 10.1016/j.autcon.2015.03.013
Keywords
Autonomous control; Construction management; Flexible capacity; Lean production; Off-site construction; Production planning; Simulation; Workflow
Funding
- RMIT School of Graduate Research, through HDRPG Grant [350380]
Ask authors/readers for more resources
Problems in existing methods of production tracking in off-site construction result in schedule delays and increased costs. To eliminate these deficiencies, an autonomous production tracking that analyzes real-time production data is proposed. A specific implementation of the proposed production tracking mechanisms has been developed for a large off-site construction plant in Australia, and is in the process of installation. The paper shows that: (i) The production model in off-site construction is always nonlinear in the outcome due to the presence of variability (ii) in systems with a periodic production target, deviation from the schedule converges to zero at the end of production period and the same downward trend should be followed in designing plan buffers and (iii) long-term production performance in off-site construction can autonomously be monitored and controlled by observing critical variables of production. The paper provides those who manage off-site construction with recommendations on effective production tracking and management. The models and propositions in this research are of practical value and can be used to detect impending production shortfalls against periodic targets in the short-term, and adjust capacity parameters and production targets in long-term planning. (C) 2015 Elsevier B.V. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available