4.7 Article

Designing CFS structures: The new school bfs in naples

Journal

THIN-WALLED STRUCTURES
Volume 78, Issue -, Pages 37-47

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.tws.2013.12.008

Keywords

Cold-formed steel constructions; Dry constructions; Sheathed stick-built buildings; Seismic design; Sheathing-braced design

Ask authors/readers for more resources

The design solutions for the new Foundation and Primary School on behalf of the British Force School (BFS) of NATO in Naples are of great interest within the national construction sector. From the structural point of view, the adoption of a stick-built system made of cold-formed steel walls braced by wood-based sheathing panels appears to best satisfy the high safety, durability and eco-efficiency standards of the client. The end result is a school complex covering an area in the region of about 3000 m(2), each element of which reflects the integrated and coordinated work of the designers and technicians, from the conceptual design to the execution phase. (C) 2014 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available