Determining the probability distribution of rework costs in construction and engineering projects

Journal

STRUCTURE AND INFRASTRUCTURE ENGINEERING
Volume 9, Issue 11, Pages 1136-1148

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/15732479.2012.667420

Keywords

rework; direct cost; indirect cost; contract value; Generalised Pareto distribution

Ask authors/readers for more resources

Rework arises due to design errors, changes and omissions during design and has been found to contribute to 52% of a project's cost overrun. The statistical characteristics of rework costs experienced from contract award in 276 construction and engineering projects were analysed. The skewness and kurtosis values of rework costs are computed to determine if the empirical distribution of the data follows a normal distribution. The empirical distributions for rework costs are found to be non-Gaussian. Theoretical probability distributions are fitted to the rework data. The Kolmogorov-Smirnov and Anderson-Darling non-parametric tests are used to determine the Goodness of Fit' of the selected probability distributions. A Generalised Pareto probability function is found to provide the best overall distribution fit for rework costs. The Generalised Pareto distribution is used to calculate the probability of rework being experienced for the selected sample. Projects with a contract value A$101 million. Larger projects may be better managed and longer completion times provide an opportunity to make adjustments to facilitate cost control. The anticipation that rework will occur using the probabilities that are derived can enable a quantitative risk assessment to be undertaken prior to the commencement of construction.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available