Life cycle cost optimisation in highway concrete bridges management

Journal

STRUCTURE AND INFRASTRUCTURE ENGINEERING
Volume 11, Issue 10, Pages 1263-1276

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/15732479.2013.845578

Keywords

bridges; infrastructure management; life cycle cost; Markov models

Funding

  1. Portuguese Foundation for Science and Technology (FCT) [SFRH/DB/49255/2008]

Ask authors/readers for more resources

This study presents a life cycle cost prediction and cost minimisation methodology for a set of highway concrete bridges, during a medium or a long period of time, in order to facilitate the decision process of the structure management. This methodology takes into consideration bridge intervention costs in addition with some Markov matrices degradation model. It applies a genetic algorithm in order to identify the optimised intervention plan, considering the available budget and the desired minimum performance level. Some Portuguese direct and indirect cost parameters, associated with different types of interventions during bridges lifetime, are presented. Finally, a probabilistic sensitivity analysis is carried out using Monte Carlo simulations.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available