Related references
Note: Only part of the references are listed.Optimized Resource Allocation for Software Release Planning
An Ngo-The et al.
IEEE TRANSACTIONS ON SOFTWARE ENGINEERING (2009)
Dynamic project performance estimation by combining static estimation models with system dynamics
KeungSik Choi et al.
INFORMATION AND SOFTWARE TECHNOLOGY (2009)
Staffing a software project: A constraint satisfaction and optimization-based approach
Ahilton Barreto et al.
COMPUTERS & OPERATIONS RESEARCH (2008)
Time-line based model for software project scheduling with genetic algorithms
Carl K. Chang et al.
INFORMATION AND SOFTWARE TECHNOLOGY (2008)
Software project management with GAs
Enrique Alba et al.
INFORMATION SCIENCES (2007)
A task allocatleon optimizer for software construction
J Duggan et al.
IEEE SOFTWARE (2004)
Multi-project management in Software Engineering using simulation modelling
B Lee et al.
SOFTWARE QUALITY JOURNAL (2004)
Assessing staffing needs for a software maintenance project through queuing simulation
G Antoniol et al.
IEEE TRANSACTIONS ON SOFTWARE ENGINEERING (2004)
Human resource selection for software development projects using Taguchi's parameter design
HT Tsai et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2003)
Optimal testing-resource allocation with genetic algorithm for modular software systems
YS Dai et al.
JOURNAL OF SYSTEMS AND SOFTWARE (2003)
Unrelated parallel machine scheduling with setup times using simulated annealing
DW Kim et al.
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING (2002)
An empirical study using task assignment patterns to improve the accuracy of software effort estimation
RK Smith et al.
IEEE TRANSACTIONS ON SOFTWARE ENGINEERING (2001)