4.5 Article

Impacts of uncertain project duration and asymmetric risk sensitivity information in project management

Related references

Note: Only part of the references are listed.
Article Computer Science, Artificial Intelligence

The impact of decision criteria on deadline-based incentive contracts in project management

Jiao Wang et al.

JOURNAL OF INTELLIGENT MANUFACTURING (2017)

Article Computer Science, Artificial Intelligence

Generating project risk response strategies based on CBR: A case study

Zhi-Ping Fan et al.

EXPERT SYSTEMS WITH APPLICATIONS (2015)

Article Management

Project management aided by verbal decision analysis approaches: a case study for the selection of the best SCRUM practices

Thais Cristina Sampaio Machado et al.

INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH (2015)

Article Computer Science, Artificial Intelligence

Integrated Fuzzy-HMH for project uncertainties in time-cost tradeoff problem

Bhupendra Kumar Pathak et al.

APPLIED SOFT COMPUTING (2014)

Article Computer Science, Interdisciplinary Applications

The impact of risk attitude in new product development under dual information asymmetry

Kai Yang et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2014)

Article Construction & Building Technology

Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique

Chen-Yu Chang

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2014)

Article Engineering, Manufacturing

Incentives in a Stage-Gate Process

Raul O. Chao et al.

PRODUCTION AND OPERATIONS MANAGEMENT (2014)

Article Management

A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem

Olfa Dridi et al.

INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH (2014)

Article Management

Balancing control and flexibility in joint risk management: Lessons learned from two construction projects

Ekaterina Osipova et al.

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT (2013)

Article Computer Science, Artificial Intelligence

A hybrid genetic algorithm for the discrete time-cost trade-off problem

Rifat Sonmez et al.

EXPERT SYSTEMS WITH APPLICATIONS (2012)

Article Management

Resource-constrained project scheduling through the goal programming model: integration of the manager's preferences

Michel Gagnon et al.

INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH (2012)

Article Economics

A principal-agent model of sequential testing

Dino Gerardi et al.

THEORETICAL ECONOMICS (2012)

Article Construction & Building Technology

Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows

Mohammad A. Ammar

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2011)

Article Engineering, Industrial

Optimal time-based and cost-based coordinated project contracts with unobservable work rates

H. Dharma Kwon et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2010)

Article Management

Project Management Contracts with Delayed Payments

H. Dharma Kwon et al.

M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT (2010)

Article Operations Research & Management Science

Channel Coordination with a Risk-Neutral Supplier and a Downside-Risk-Averse Retailer

Xianghua Gan et al.

PRODUCTION AND OPERATIONS MANAGEMENT (2010)

Article Construction & Building Technology

Entropy-based scheduling of resource-constrained construction projects

Symeon Christodoulou et al.

AUTOMATION IN CONSTRUCTION (2009)

Article Engineering, Multidisciplinary

Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost

Abbas Afshar et al.

ENGINEERING OPTIMIZATION (2009)

Article Business

Alliance Governance: Balancing Control and Trust in Dealing with Risk

Ard-Pieter de Man et al.

LONG RANGE PLANNING (2009)

Article Management

Simple probability models for project contracting

A Paul et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2005)

Article Economics

Log-concave probability and its applications

M Bagnoli et al.

ECONOMIC THEORY (2005)

Article Management

Incentives between firms (and within)

R Gibbons

MANAGEMENT SCIENCE (2005)

Article Construction & Building Technology

Finance-based scheduling of construction projects using integer programming

AM Elazouni et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE (2004)

Article Economics

Distortion and risk in optimal incentive contracts

G Baker

JOURNAL OF HUMAN RESOURCES (2002)

Article Mathematics, Applied

Pontryagin's principle for the control of parabolic equations with gradient state constraints

E Casas et al.

NONLINEAR ANALYSIS-THEORY METHODS & APPLICATIONS (2001)

Article Business, Finance

Performance standards in incentive contracts

KJ Murphy

JOURNAL OF ACCOUNTING & ECONOMICS (2000)