4.3 Article

Preliminary results of a finite-element, multi-scale model of the Mahakam Delta (Indonesia)

Journal

OCEAN DYNAMICS
Volume 61, Issue 8, Pages 1107-1120

Publisher

SPRINGER HEIDELBERG
DOI: 10.1007/s10236-011-0410-y

Keywords

Finite element; Model; Mahakam River; Multi-scale; Tide; Hydrodynamics

Categories

Funding

  1. Communaute Francaise de Belgique [ARC 10/15-028]

Ask authors/readers for more resources

The Mahakam is a 980-km-long tropical river flowing in the East Kalimantan province (Borneo Island, Indonesia). A significant fraction of this river is influenced by tides, the modelling of which is the main subject of this study. Various physical and numerical issues must be addressed. In the upstream part of the domain, the river flows through a region of three lakes surrounded by peat swamps. In the lowland regions, the river is meandering and its hydrodynamics is mostly influenced by tides. The latter propagate upstream of the delta, in the main river and its tributaries. Finally, the mouth of the Mahakam is a delta exhibiting a high number of channels connected to the Makassar Strait. This article focusses on the flow in the delta channels, which is characterised by a wide range of time and space scales. To capture most of them, the depth-integrated and the section-integrated versions of the unstructured mesh, finite-element model Second-Generation Louvain-la-Neuve Ice-Ocean Model are used. Unstructured grids allow for a refinement of the mesh in the narrowest channels and also an extension of the domain upstream and downstream of the delta in order to prescribe the open-boundary conditions. The Makassar Strait, the Mahakam Delta and the three lakes are modelled with 2D elements. The rivers, from the upstream limit of the delta to the lakes and the upstream limit of the domain, are modelled in 1D. The calibration of the tidal elevation simulated in the Mahakam Delta is presented. Preliminary results on the division of the Eulerian residual discharge through the channels of the delta are also presented. Finally, as a first-order description of the long-term transport, the age of the water originating from the upstream limit of the delta is computed. It is seen that for May and June 2008, the time taken by the water parcel to cross the estuary varies from 4 to 7 days depending on the channel under consideration.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.3
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available