Related references
Note: Only part of the references are listed.A unified approach for the evaluation of quay crane scheduling models and algorithms
Frank Meisel et al.
COMPUTERS & OPERATIONS RESEARCH (2011)
A survey of berth allocation and quay crane scheduling problems in container terminals
Christian Bierwirth et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2010)
An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports
R. Tavakkoli-Moghaddam et al.
COMPUTERS & INDUSTRIAL ENGINEERING (2009)
A fast heuristic for quay crane scheduling with interference constraints
Christian Bierwirth et al.
JOURNAL OF SCHEDULING (2009)
Quay crane scheduling with handling priority in port container terminals
Der-Horng Lee et al.
ENGINEERING OPTIMIZATION (2008)
Quay crane scheduling with non-interference constraints in port container terminals
Der-Horng Lee et al.
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW (2008)
A tabu search heuristic for the quay crane scheduling problem
Marcello Sammarra et al.
JOURNAL OF SCHEDULING (2007)
A m-parallel crane scheduling problem with a non-crossing constraint
Andrew Lim et al.
NAVAL RESEARCH LOGISTICS (2007)
Crane scheduling with non-crossing constraint
Y. Zhu et al.
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY (2006)
Quay crane scheduling in container terminals
W. C. Ng et al.
ENGINEERING OPTIMIZATION (2006)
A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
L Moccia et al.
NAVAL RESEARCH LOGISTICS (2006)
Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
JY Liu et al.
NAVAL RESEARCH LOGISTICS (2006)
A crane scheduling method for port container terminals
KH Kim et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2004)