4.7 Article

Likely effects of construction of Scroby Sands offshore wind farm on a mixed population of harbour Phoca vitulina and grey Halichoerus grypus seals

Journal

MARINE POLLUTION BULLETIN
Volume 64, Issue 4, Pages 872-881

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.marpolbul.2012.01.029

Keywords

Pinniped; Haul-out; Offshore wind farm; Pile-driving; Construction noise; Aerial survey

Ask authors/readers for more resources

Scroby Sands offshore wind farm was built close to a haul-out and breeding site for harbour seal, a species of conservation concern. An aerial survey programme conducted during a five-year period spanning wind farm construction, revealed a significant post-construction decline in haul-out counts. Multivariate model selection suggested that the decline was not related to the environmental factors considered, nor did it mirror wider population trends. Although cause and effect could not be unequivocally established, the theoretical basis of hearing in pinnipeds and previous studies suggested that extreme noise (to 257 dB re 1 mu Pa-pp @ 1 m) generated by pile-driving of turbine bases led to displacement of seals. A lack of full recovery of harbour seal during the study was also linked to their sensitivity to vessel activity and/or rapid colonisation of competing grey seal. Any impact of offshore wind farm development upon pinnipeds would be much reduced without pile-driving. (C) 2012 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available