Journal
RELIABILITY ENGINEERING & SYSTEM SAFETY
Volume 137, Issue -, Pages 76-86Publisher
ELSEVIER SCI LTD
DOI: 10.1016/j.ress.2015.01.002
Keywords
Lot sizing; Production; Inventory; Preventive maintenance
Funding
- NSFC [71231001, 71420107023, 71301009]
- Fundamental Research Funds for the Central Universities of China [FRF-SD-12-020A]
- MOE PhD supervisor fund [20120006110025]
Ask authors/readers for more resources
This paper considers a production system that can produce multiple products alternately. Products go through the system in a sequence and a complete run of all products forms a production cycle. An integrated production, inventory and preventive maintenance model is constructed, which is characterized by the delay-time concept. Two different situations are studied based on whether the unqualified products and downtime caused by the failures of the system, set-up and preventive maintenance can be ignored or not. Three cases are considered for each situation, depending on the position of the preventive maintenance epochs: the first case, where preventive maintenance is carried out at the end of each production cycle; the second case, where preventive maintenance is carried out at each set-up time of the products; and the third case, where preventive maintenance is carried out at some set-up times only, since it may not always be optimal to carry out preventive maintenance at the end of the production cycle or at each set-up time. The modeling objectives are to find the optimal number of production cycles per year and the optimal position of preventive maintenance that will maximize the expected profit per unit time. Numerical examples, using real data, are presented to illustrate the model. (C) 2015 Elsevier Ltd. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available