4.7 Article

Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing

Journal

JOURNAL OF MANUFACTURING SYSTEMS
Volume 29, Issue 1, Pages 1-9

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.jmsy.2010.06.004

Keywords

-

Funding

  1. University of Tehran [8106043/1/13]

Ask authors/readers for more resources

This paper presents a new nonlinear multi-objective mathematical model for a single-machine scheduling problem with three objectives: (1) minimizing the sum of the weighted jobs completion, (2) minimizing the sum of the weighted delay times, and (3) maximizing the sum of the job values in makespan. In addition, a number of constraints are incorporated in this presented model, such as repairing and maintenance periods, deterioration of jobs, and learning effect of the work process. Since this type of scheduling problem belongs to a class of NP-hard ones, its solution by common software packages is almost impossible, or at best very time consuming. Thus, a meta-heuristic algorithm based on simulated annealing (SA) is proposed to solve such a hard problem. At a final stage, the related results obtained by the proposed SA are compared with those results reported by the Lingo 8 software in order to demonstrate the efficiency and capability of our proposed SA algorithm. (C) 2010 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available