4.3 Article

Mind the gap: The impact of missing data on the calculation of phytoplankton phenology metrics

Journal

JOURNAL OF GEOPHYSICAL RESEARCH-OCEANS
Volume 117, Issue -, Pages -

Publisher

AMER GEOPHYSICAL UNION
DOI: 10.1029/2012JC008249

Keywords

-

Categories

Funding

  1. UK Natural Environment Research Council (NERC) as part of an Ocean and Earth Science postgraduate research program at the University of Southampton
  2. NERC [NE/G013055/1]
  3. NERC NA
  4. NERC [noc010010, NE/G013055/1, noc010005, noc010002, noc010009] Funding Source: UKRI
  5. Natural Environment Research Council [NE/G013055/1, noc010005, noc010010, noc010009, noc010002] Funding Source: researchfish

Ask authors/readers for more resources

Annual phytoplankton blooms are key events in marine ecosystems and interannual variability in bloom timing has important implications for carbon export and the marine food web. The degree of match or mismatch between the timing of phytoplankton and zooplankton annual cycles may impact larval survival with knock-on effects at higher trophic levels. Interannual variability in phytoplankton bloom timing may also be used to monitor changes in the pelagic ecosystem that are either naturally or anthropogenically forced. Seasonality metrics that use satellite ocean color data have been developed to quantify the timing of phenological events which allow for objective comparisons between different regions and over long periods of time. However, satellite data sets are subject to frequent gaps due to clouds and atmospheric aerosols, or persistent data gaps in winter due to low sun angle. Here we quantify the impact of these gaps on determining the start and peak timing of phytoplankton blooms. We use the NASA Ocean Biogeochemical Model that assimilates SeaWiFS data as a gap-free time series and derive an empirical relationship between the percentage of missing data and error in the phenology metric. Applied globally, we find that the majority of subpolar regions have typical errors of 30 days for the bloom initiation date and 15 days for the peak date. The errors introduced by intermittent data must be taken into account in phenological studies.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.3
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available