4.5 Article

Modeling Worker Competence to Advance Precast Production Scheduling Optimization

Journal

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0001556

Keywords

Human factors; Workforce development; Scheduling; Optimization; Precast production

Funding

  1. Key Technology and Development Program in Shanghai of the Shanghai Commission of Science and Technology [14DZ1207101]

Ask authors/readers for more resources

Current precast production scheduling methodologies often have limited applicability in practice largely due to the limited consideration of human factors and interactions between the scheduling and workforce development. This study systematically integrates human factors in the form of worker competence into production scheduling. More specifically, the factors of worker learning rate, professional skills, experience in each type of operation, and operation specifications are all formulated to determine the duration of each process in precast production. A two-hierarchy scheduling optimization model (WCSO_PP) considering worker competence is proposed to synchronize the production scheduling with workforce development and to optimize the scheduling from both the short-term (time-oriented) and long-term (competence-oriented) views. Finally, the performance of the proposed model is validated using a real case study. The WCSO_PP model can achieve 74.09% and 73.01% cost savings in short-term and long-term scenarios, respectively. The developed model addresses the research gap in modeling the impact of human factors on the production, contributing to more reliable scheduling and enhancing the long-term human resource development.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available