4.5 Article

Calculation of Greenhouse Gas Emissions for Highway Construction Operations by Using a Hybrid Life-Cycle Assessment Approach: Case Study for Pavement Operations

Journal

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
Volume 137, Issue 11, Pages 1015-1025

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0000349

Keywords

Sustainability; Life-cycle assessment; Construction management; GHG; Operations

Funding

  1. Michigan Department of Transportation
  2. Michigan Tech Transportation Institute

Ask authors/readers for more resources

Large quantities of greenhouse gases (GHG) are emitted in producing and acquiring materials for the construction, maintenance, and rehabilitation of highway infrastructure. The objective of this paper is to develop and illustrate a method that can be applied by state agencies to quantify the life-cycle emissions associated with different pavement designs. It applies existing life-cycle assessment (LCA) methods that integrate process-level construction data. The research emphasizes the construction phase and contributes a method that can be used to develop and analyze construction phase life-cycle inventories. It describes on-site collection of material and equipment usage data during construction and rehabilitation operations. Departing from traditional approaches that tend to use LCA as a way to compare alternative pavement materials or designs on the basis of estimated inventories, this paper proposes a shift to a context-sensitive process-based approach that uses actual observed construction data to calculate greenhouse gas emissions using a hybrid LCA. The goal is to support strategies that reduce long-term environmental impacts. A case study involving the rehabilitation of a concrete pavement was used to illustrate the proposed method. The key findings were as follows: total CO2 emissions are 787.19 and 1,383.28 MT per lane mile for Hybrid Models 1 and 2, respectively; the production of the materials, equipment, and fuel used to construct the project account for 90% and 94% of the total CO2 emissions throughout the construction phase for Hybrid Models 1 and 2, respectively; the equipment use and transportation impacts together only represent 6-10% of the total emission through the construction phase. DOI: 10.1061/(ASCE)CO.1943-7862.0000349. (C) 2011 American Society of Civil Engineers.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available