Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling

Journal

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE
Volume 137, Issue 12, Pages 1080-1088

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0000368

Keywords

Resource management; Scheduling; Optimization

Ask authors/readers for more resources

Construction scheduling techniques often generate schedules that cause undesirable resource fluctuations that are inefficient and costly to implement on site. This paper presents the development of a novel multiobjective optimization model that is capable of measuring and minimizing these undesirable resource fluctuations to maximize resource utilization efficiency and minimize project duration while complying with all precedence relationships and resource availability constraints. The model incorporates three main modules: (1) a startup module that calculates lower and upper bounds for the model decision variables; (2) a scheduling module that generates practical schedules and evaluates their performance; and (3) a multiobjective genetic algorithm module that searches for and identifies optimal schedules. The model is integrated in a commercially available software system to facilitate its use and adoption by construction planners. An application example is analyzed to illustrate the use of the model and demonstrate its new and unique capabilities in generating optimal trade-offs between maximizing resource utilization efficiency and minimizing the duration of construction projects. DOI: 10.1061/(ASCE)CO.1943-7862.0000368. (C) 2011 American Society of Civil Engineers.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available