4.6 Article

RFID+4D CAD for progress management of structural steel works in high-rise buildings

Journal

JOURNAL OF COMPUTING IN CIVIL ENGINEERING
Volume 22, Issue 2, Pages 74-89

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0887-3801(2008)22:2(74)

Keywords

-

Ask authors/readers for more resources

This research presents a strategy and information system to manage the logistics and progress control of structural steel works under the integrated environment of radio frequency identification and four-dimensional computer-aided design (4D CAD). Considering the characteristics of the manufacturing and erection processes of structural steel works in high-rise building construction from a practical point of view, this research has developed a strategy to support successful application of these two state-of-the-art technologies and has developed an information system to support the logistics and progress management based on this strategy. The results of this research have been validated and verified through real-world applications in two high-rise building construction projects considering realistic constraints. Time study has been conducted to verify the efficiency of the proposed information system. In addition, lessons learned and issues identified through these real-world applications are described and discussed in this paper.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available