4.6 Article

SEMI-IDEAL BIDDING VIA A FUZZY TOPSIS PROJECT EVALUATION FRAMEWORK IN RISKY ENVIRONMENTS

Journal

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Volume 19, Issue -, Pages S106-S115

Publisher

VILNIUS GEDIMINAS TECH UNIV
DOI: 10.3846/13923730.2013.801884

Keywords

risk; bid/no-bid; decision making; fuzzy TOPSIS; contractor

Ask authors/readers for more resources

Blind involvement in aimless bids may result the loss of bidding bond expenditures, purchased bidding documents, the cost of human resources engaged in mark-up estimation, and detailed project investigation costs such as site visits. In this research, a risk based fuzzy TOPSIS framework is set up to evaluate and prioritize bidding opportunities. This may help contractors to assign their limited resources to near optimal selected projects. The risks inherent in the nature of every tender, makes systematic risk analysis a prerequisite for any construction company. Proposed framework considers key determining risk factors such as corporate considerations, tender environment, contractual issues, and project specific risks. The methodology implementation has been facilitated by developing a graphical user interface that accepts linguistic terms expressed by main decision groups. A case study demonstrates the applicability of the model.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available