Related references
Note: Only part of the references are listed.A TWO-PHASE METHOD FOR THE CAPACITATED FACILITY PROBLEM OF COMPACT CUSTOMER SUB-SETS
Jaroslav Janacek et al.
TRANSPORT (2009)
THE UNCERTAINTY EVALUATION METHOD OF SUPPLY CHAIN RELIABILITY
Xin Miao et al.
TRANSPORT (2009)
Agile forecasting of dynamic logistics demand
Xin Miao et al.
TRANSPORT (2008)
Simulation model for supply chain reliability evaluation
Ruslan Klimov et al.
TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY (2008)
Supply chain simulation modeling for the manufactured housing industry
Jae G. Jeong et al.
JOURNAL OF URBAN PLANNING AND DEVELOPMENT (2006)
Developing a resource supply chain planning system for construction projects
HP Tserng et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2006)
Towards an agent-based construction supply network modelling and simulation platform
JHM Tah
AUTOMATION IN CONSTRUCTION (2005)
Strategic positioning of inventory to match demand in a capital projects supply chain
KD Walsh et al.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2004)
A review and analysis of supply chain operations reference (SCOR) model
SH Huan et al.
SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL (2004)
Linking SCOR planning practices to supply chain performance - An exploratory study
A Lockamy et al.
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT (2004)