Related references
Note: Only part of the references are listed.Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
J. Navaei et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2013)
Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times
A. Mozdgir et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2013)
A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem
E. Shokrollahpour et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2011)
Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
E. Torabzadeh et al.
ADVANCES IN ENGINEERING SOFTWARE (2010)
Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times
Sara Hatami et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2010)
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
Fawaz S. Al-Anzi et al.
COMPUTERS & OPERATIONS RESEARCH (2009)
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
Fawaz S. Al-Anzi et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2007)
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
Ali Allahverdi et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2006)
A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
A Tozkapan et al.
COMPUTERS & OPERATIONS RESEARCH (2003)
A fast and elitist multiobjective genetic algorithm: NSGA-II
K Deb et al.
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2002)
The three-stage assembly flowshop scheduling problem
C Koulamas et al.
COMPUTERS & OPERATIONS RESEARCH (2001)