4.7 Article

Coupling a genetic algorithm with the distributed arrival-time control for the JIT dynamic scheduling of flexible job-shops

Journal

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 52, Issue 12, Pages 3688-3709

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2014.881575

Keywords

genetic algorithms; manufacturing control; arrival time control; dynamic scheduling; flexible job-shop; Just-in-Time

Funding

  1. scholarship program, Francisco Jose de Caldas - Generacion del Bicentenario of the Administrative Department of Science, Technology and Innovation - COLCIENCIAS
  2. Javeriana University (Bogota, Colombia)

Ask authors/readers for more resources

In order to increase customer satisfaction and competitiveness, manufacturing systems need to combine flexibility with Just-in-Time (JIT) production. Until now, research on JIT scheduling problems has been mostly limited to high volume assembly lines rather than job-shop-like systems, due to their combinatorial complexity. In this paper, we propose a generic strategy for dynamically controlling task schedules by coupling genetic algorithms and distributed arrival-time control to optimise JIT performance. We explore two such hybrid approaches: a sequential approach where the two algorithms work separately and an integrated approach where the distributed arrival time control is embedded into the genetic algorithm. Performance of these approaches is benchmarked with quadratic linear programme solutions to get a gauge of their relative strengths in a static environment. Results from applying these approaches to a job-shop-like automated cell verify their effectiveness for JIT manufacturing under realistic dynamically changing environment.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available