Related references
Note: Only part of the references are listed.Unrelated parallel machine scheduling with setup times and ready times
Yang-Kuei Lin et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2014)
Solving the team orienteering problem using effective multi-start simulated annealing
Shih-Wei Lin
APPLIED SOFT COMPUTING (2013)
Minimizing makespan and total flowtime in permutation flowshops by a bi-objective multi-start simulated-annealing algorithm
Shih-Wei Lin et al.
COMPUTERS & OPERATIONS RESEARCH (2013)
Multiple-objective heuristics for scheduling unrelated parallel machines
Yang-Kuei Lin et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2013)
Multi-start methods for combinatorial optimization
Rafael Marti et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2013)
Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems
Y. K. Lin et al.
COMPUTERS & OPERATIONS RESEARCH (2011)
Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints
Shih-Wei Lin et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2011)
Optimizing fuzzy makespan and tardiness for unrelated parallel machine scheduling with archived metaheuristics
Chiuh-Cheng Chyu et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2011)
Applying multi-start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times
Shih-Wei Lin et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2011)
Robust scaling parameters for composite dispatching rules
Jenny Yan Chen et al.
IIE TRANSACTIONS (2010)
A new parallel genetic algorithm for solving multiobjective scheduling problems subjected to special process constraint
Jiaquan Gao et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2009)
Scheduling on unrelated parallel machines with sequence- and machine-dependent setup times and due-date constraints
Jeng-Fung Chen
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2009)
Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times
Pedro Leite Rocha et al.
COMPUTERS & OPERATIONS RESEARCH (2008)
Optimal allocation and processing time decisions on non-identical parallel CNC machines:: ε-constraint approach
Sinan Gurel et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2007)
Minimization of maximum tardiness on unrelated parallel machines with process restrictions and setups
Jeng-Fung Chen
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2006)
Makespan minimization for scheduling unrelated parallel machines: A recovering beam search approach
M Ghirardi et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2005)
Scheduling unrelated parallel machines to minimize total weighted tardiness
CF Liaw et al.
COMPUTERS & OPERATIONS RESEARCH (2003)
The development of gradual-priority weighting approach for the multi-objective flowshop scheduling problem
PC Chang et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2002)
Unrelated parallel machine scheduling with setup times using simulated annealing
DW Kim et al.
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING (2002)
A bicriterion approach to deal with a constrained single-objective problem
C Dhaenens-Flipo
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2001)
Tabu search for scheduling on identical parallel machines to minimize mean tardiness
VA Armentano et al.
JOURNAL OF INTELLIGENT MANUFACTURING (2000)
Scheduling jobs with release dates and tails on two unrelated parallel machines to minimize the makespan
G Lancia
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2000)