Multi-level job scheduling in a flexible job shop environment

Journal

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 52, Issue 13, Pages 3877-3887

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2013.848487

Keywords

production scheduling; multi-level job structure; flexible job shop; genetic algorithm

Funding

  1. Ministry of Trade, Industry and Energy (MOTIE) grant - Korean government [10033895]

Ask authors/readers for more resources

This study deals with a scheduling problem with multi-level job structures in a flexible job shop environment. This scheduling process arises after the part production plans are created by the MRP (material requirement planning) system, therefore the total tardiness measure is considered as an objective function in order to complete the parts by the set due dates. MILP (mixed integer linear programming) model is introduced to mathematically represent the target problem. Owing to the high complexity of the target problem, GA (genetic algorithm) is proposed to solve the problem and additional methods, such as priority rules and local search rules, are applied to improve the performance of GA. Computational examples are shown and the results are discussed in comparison with the results of IBM ILOG CPLEX and IBM ILOG CP Optimizer.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available