Related references
Note: Only part of the references are listed.Total flow time minimization in a flowshop sequence-dependent group scheduling problem
Nasser Salmasi et al.
COMPUTERS & OPERATIONS RESEARCH (2010)
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
Imma Ribas et al.
COMPUTERS & OPERATIONS RESEARCH (2010)
The hybrid flow shop scheduling problem
Ruben Ruiz et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2010)
Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops
M. Zandieh et al.
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY (2009)
Sequence-dependent group scheduling problems in flexible flow shops
R Logendran et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2006)
Group scheduling in flexible flow shops
R Logendran et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2005)