4.7 Article

Simultaneous supply and production planning

Journal

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 49, Issue 13, Pages 3795-3813

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2010.492406

Keywords

ELSSP; lot-sizing; scheduling; inventory; vehicle routing; common cycle policy

Ask authors/readers for more resources

This paper considers a novel production and logistics planning problem called the Economic Lot and Supply Scheduling Problem. The problem combines the Economic Lot-Sizing Problem and the Vehicle Routing Problem into a simultaneous problem-solving approach. The considered problem is observable in several industrial areas, e.g. in retailing and in the automotive industry. Assuming a certain delivery policy the paper presents a complete mathematical model and a epsilon-exact solution procedure. Analytical results for a broad range of test instances are calculated which demonstrate new insights into the considered planning problem. The results emphasise the economic advantage of the proposed simultaneous modeling and solution approach, especially for certain parameter settings.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available