Journal
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 49, Issue 8, Pages 2169-2182Publisher
TAYLOR & FRANCIS LTD
DOI: 10.1080/00207541003733775
Keywords
job-shop scheduling; genetic algorithm; flexible; blocking; design
Ask authors/readers for more resources
This paper presents a study of a practical job-shop scheduling problem modelled and solved when helping a company to design a new production workshop. The main characteristics of the problem are that some resources are flexible, and blocking constraints have to be taken into account. The problem and the motivation for solving it are detailed. The modelling of the problem and the proposed resolution approach, a genetic algorithm, are described. Numerical experiments using real data are presented and analysed. We also show how these results were used to support choices in the design of the workshop.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available