Related references
Note: Only part of the references are listed.Lot sizing and furnace scheduling in small foundries
Silvio A. de Araujo et al.
COMPUTERS & OPERATIONS RESEARCH (2008)
Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
Patrizia Beraldi et al.
COMPUTERS & OPERATIONS RESEARCH (2008)
A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality
Fantahun M. Defersha et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2008)
Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource
Horst Tempelmeier et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2008)
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
Silvio A. de Araujo et al.
JOURNAL OF HEURISTICS (2007)
Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches
Raf Jans et al.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2007)
Single machine multi-product capacitated lot sizing with sequence-dependent setups
Bernardo Almada-Lobo et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2007)
Simultaneous lot sizing and scheduling for multi-product multi-level production
Guenter Fandel et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2006)
The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
D Gupta et al.
COMPUTERS & OPERATIONS RESEARCH (2005)
The capacitated lot sizing problem: a review of models and algorithms
B Karimi et al.
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE (2003)
MIP-based heuristics for capacitated lotsizing problems
C Mercé et al.
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2003)
Optimization approximations for capacity constrained material requirements planning
AR Clark
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2003)
Rolling-horizon lot-sizing when set-up times are sequence-dependent
AR Clark et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2000)