Related references
Note: Only part of the references are listed.
Article
Engineering, Industrial
Hybrid GA and SA dynamic set-up planning optimization
SK Ong et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2002)
Article
Engineering, Industrial
Evaluating the manufacturability of machined parts and their setup plans
SK Ong et al.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2000)