4.6 Article

Optimal PMU placement method for complete topological observability of power system under various contingencies

Journal

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.ijepes.2014.03.068

Keywords

Phasor measurement units; Power system observability; Integer linear programming; Channel capacity

Ask authors/readers for more resources

In optimal phasor measurement units (PMUs) placement problem, it is assumed that each PMU can measure unlimited number of voltages and currents. However, available PMUs have limited number of channels and cannot measure the current phasors of all their incident lines. This paper investigates the effect of channel capacity of PMUs on their optimal placement for complete power system observability. At first, the conventional complete observability of power networks is formulated. Then, a revised formulation for the optimal placement problem of these types of PMUs is presented. Proposed method is further extended for assuring complete observability under single PMU loss or single line outage cases. The proposed method is demonstrated on several IEEE standard test systems and compared with the existing techniques. Results show that the proposed method is simple to implement and accurate compared to other existing methods. (c) 2014 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available