4.6 Article

Group scheduling with independent setup times, ready times, and deteriorating job processing times

Journal

Publisher

SPRINGER LONDON LTD
DOI: 10.1007/s00170-011-3639-1

Keywords

Scheduling; Single machine; Deteriorating jobs; Group technology; Ready time

Funding

  1. Research Grants Council of the Hong Kong Special Administrative Region, China [PolyU 5170/11E]
  2. National Natural Science Foundation of China [11001181]
  3. Science Research Foundation of Shenyang Aerospace University [201011Y]

Ask authors/readers for more resources

In this paper we investigate a single machine scheduling problem with deteriorating jobs and group technology assumption. By deteriorating jobs and group technology assumption, we mean that job processing times are simple linear functions of its starting times. The group setup times are assumed to be known and fixed. We attempt to minimize the makespan with ready times of the jobs. For a special case, we show that the problem can be solved in polynomial time when deterioration and group technology are considered simultaneously.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available