Journal
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
Volume 60, Issue 9-12, Pages 1063-1069Publisher
SPRINGER LONDON LTD
DOI: 10.1007/s00170-011-3646-2
Keywords
Fuzzy flexible job shop scheduling; Swarm-based neighborhood search; Swap; Insertion; Multi-objective optimization
Ask authors/readers for more resources
This paper considered fuzzy flexible job scheduling problems with makespan and maximum machine workload and proposed a multi-objective swarm-based neighborhood search (MOSNS). In MOSNS, ordered operation-based doublet string and three-dimension array are used to indicate the solution of two subproblems, two swaps and an insertion are applied to produce new solutions, simple weighted objective-based methods are used to update swarm and external archive to obtain a set of nondominated solutions. Some numerical experiments are conducted by using some instances and computational results show that MOSNS performs better than the existing methods from literature.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available